How a 300L Mixer Line Cut Assembly Lead Time by 72%
How single-piece flow, standardized work and Kanban cut assembly lead time on a 300L mixer line from 654 to 180 minutes and WIP inventory by up to 87.5%. [...]
How single-piece flow, standardized work and Kanban cut assembly lead time on a 300L mixer line from 654 to 180 minutes and WIP inventory by up to 87.5%. [...]
SMED Case Study: Cutting VMC Setup Time from 210 to 120 Minutes Oct 14, 2026 @acitya Every minute a CNC machine stands idle during a changeover is lost capacity. This SMED case study shows how a shop-floor team cut setup time on a critical vertical machining center (VMC) by 42.8% [...]